The horse-drawn railway made a large loop in the municipality of Leopoldschlag in order to
comply with the prescribed 2.1% gradient. The so-called double loop (approx. 8 km long) was one of the most remarkable construction sections of the entire railway line in terms of engineering;
Please get in touch for more information.