Description: The Austrian Federal Forests would like to inform you that a timber harvesting operation including the construction of a transport cableway is taking place in the area of the south side (left side) of the Vorderer Langbathsee. This section of the route is therefore expected to be closed until early/mid-June 2026.
Start: from 7 or 8 May 2026
Duration: several weeks (depending on weather conditions)
Bypass: All paths are accessible except for the southern connecting section to the hunting lodge; the northern (right-hand) connecting section leads to the Hinterer Langbathsee lake.
The closed section of the trail is marked in red on the attached map.
diversion information: right bank Vorderer Langbathsee
3-lake tour - via the Langbath lakes to the Traunsee.
Please get in touch for more information.