The Abwinden-Asten Power Station was built on the Danube in the years 1976 to 1979.
This power plant has nine horizontal shaft Kaplan bulb turbines which are generating clean power from renewable hydropower on the right bank of the Danube. On the left bank you´ll find the weir system.Please get in touch for more information.
Legal contact information
Donaukraftwerk Abwinden-Asten