The history of the wind farm: The first met mast was erected on 2 July 1997. Encouraged by the first promising measurements, the realisation of the project began in 1998. There are three wind turbines in Oberrödham and two in Steindlberg. Managing Director: Anton Haunold, 4755 Zell/Pram (07764/ 20140) Technical data:
Type: Vestas V 47-660/200kW Nominal power: 600 kW Rotor diameter: 47 m Rotor area: 1,735 m² Switch-on speed: 3.5 m/sec Nominal speed: 16 m/sec, switch-off speed: 25 m/sec
Environmental balance:
Annual yield in kWh: 3.177.748 Electricity for households: 1510 Savings in litres of oil/year: 1,800,000 CO2 reduction tonnes/year: 4541